Morgan Suo of MiniMax uses a financial-research assignment to explain model-speed tradeoffs. A 17-minute talk on AI Engineer.
Start with an acceptable finished report
- The task spans 14 company reports: are circuit-board suppliers turning growing AI-server demand into cash?
- An analyst needs accessible sources, matching reporting periods, checkable calculations and evidence that could change the conclusion.
- Rising profit can coexist with weak cash flow when customers owe money or inventory absorbs cash.
Faster internals still need task-level checks
- Sparse attention selects parts of a long input for closer processing; a short cash-flow footnote can matter more than pages of outlook.
- A separate retrieval test reportedly passed 39 requests, with inputs reaching about 830,000 tokens; real-report evidence needs its own tests.
- Lower precision stores internal numbers in fewer bits, reducing data movement; average scores can hide regressions on particular tasks.
- Speculative decoding drafts several tokens for the main model to check; drafting, rejected work and verification all consume time.
More output can mean a longer wait
- A separate serving test doubled simultaneous requests from 32 to 64 and produced about 1.9 times the total output per second.
- The slow-end wait for the first token rose sharply; measure delivery of the usable report as well as initial output.
- A separate coding test fell from 80% accuracy at maximum reasoning to 68% at high reasoning, despite using fewer output tokens.
- Set and record the reasoning budget explicitly; the documented default discussed here is maximum effort.
Compare the whole workflow
- Fix the question, source reports, information cutoff and acceptance criteria before comparing models.
- Count retrieval, tool calls, retries, failed attempts and human corrections in the cost of an acceptable report.
- Test expected user load against a delivery deadline, preserving model versions, runtime settings, prompts and failure examples.
- Roll out gradually and keep a rollback route.
Caveat: these are MiniMax’s internal examples and separate component tests. The talk gives a method for evaluating the research workflow, without a complete measured before-and-after result for that job.
“If a person must fix the report before use, count that work too.” — Morgan Suo